RIDOT Bridge Replacement and Rehabilitation of Warwick Bridges No. 820 & 821

GM2 worked closely with the State of Rhode Island’s Department of Transportation to complete the replacement of West Natick Road Bridge No. 820 and the rehabilitation of Warwick Mall Bridge No. 821 under RIDOT’s 2018 On-Call Bridge Design Consultant Contract.

For both bridges, GM2 prepared Bridge Type Study/Bridge Evaluation reports, hazardous materials investigations, environmental documentation, utility investigation and coordination, final design documents, and advertising documents.