I-95 Bridge No. 32

Client: CTDOT

Construction Cost: $90 Million

Key Facts:

  • 17 Span Bridge with Overall Length of 1,065FT
  • Rehabilitation Study
  • Load Rating Analysis
  • Complex Maintenance & Protection of Traffic
  • Coordination with MetroNorth

GM2 developed a Rehabilitation Study with findings and recommendations for this highly complex structure carrying 7 lanes of I-95 over local roads and 6 MetroNorth Railroad tracks. This area has an ADT of approximately 140,000 and is one of the busiest commuter rails in the country. Bridge No. 32's 17 spans are comprised of steel multi-girder bridges, on spans 1-6 and 8-17; span 7 is a steel through girder/floorbeam system that supports a reinforced concrete deck and spans at a severe skew.