Oxford Street Bridge #653

Oxford, RI
    Client:

    RIDOT

    Construction Cost:

    $8 Million

    Key Facts:
    • Design-Build Procurement
    • Accelerated Bridge Construction
    • Maintenance & Protection of Traffic
    • Comprehensive Design Services, Permitting & Utility Coordination
    • Completed 6 Months Ahead of Schedule


    GM2 is serving as the lead design firm under a Design-Build contract with RIDOT for the replacement of Bridge No. 653 carrying 9 lanes of I-95 over Oxford Street in Providence. The scope of work entails replacement of the bridge superstructure using Accelerated Bridge Construction techniques and rehabilitation of the existing abutment. With a high traffic volume and substantial site constraints the maintenance and protection of traffic is a critical factor. Watch Aerial Video >>