Client: Florida Department of Transportation
Construction Cost: $177M
Key Facts:
This major interchange reconfiguration project includes a collector-distributor system along I-295. The asphalt and concrete riding surfaces are constructed on engineered embankments. The work includes numerous drainage structures and erosion control devices, significant maintenance and protection of traffic, signage, ITS and lighting structures.