Judge S.S. Jolley Bridge

Client: Florida Department of Transportation

Construction Cost: $25.5M

Key Facts:

  • Design-Build
  • Fast-tracked, opened 21 months after notice-to-proceed

The Judge S.S. Jolley Bridge connects US 41 and Marco Island in Collier County, Florida. This $25.5 million concrete bridge is 1,600’ long and was built adjacent to an existing structure across the Intracoastal Waterway to expand the existing traffic capacity from two lanes to four. In addition, the bridge carries an 8’ sidewalk with overlooks. The fast-track design-build project was opened to traffic on time, just 21 months after notice-to-proceed.