Client: Lebanon Municipal Airport
Key Facts:
GM2 was contracted by the City’s airport consultant to provide boundary delineation, existing conditions plans, Lebanon Airport utility locations, and topography for the design development of the expansion of an existing maintenance structure at the airport funded by the FAA.