Manchester-Boston Regional Airport Survey

Client: Manchester-Boston Regional Airport

Key Facts:

  • Over 73 Acres of Survey
  • Lot A Access Improvements
  • Taxiway A & B Rehabilitation
  • Runway 17-35 Rehabilitation
  • Taxiway H Rehabilitation
  • Runway 24 Rehabilitation
  • Runway 24 Control

GM2 provided existing conditions plans at contours ranging from 0.2’ – 1’ contour intervals in winter conditions for numerous airport rehabilitation projects. Work was successfully coordinated and submitted within 45-60 days from Notice to Proceed. For the Runway 24 Control project GM2 re-set the threshold pin and both FAA reference stations that were destroyed during the resurfacing of Runway 24.