Key Facts:

  • Existing Conditions Survey

GM2 was contracted by MHT’s airport consultant to provide an existing conditions plan encompassing 3.5 acres at the access drive to the terminal building and parking areas including a section of “Lot A”. The field work consisted of establishing control, setting up traverse, location of existing site features, buildings, pavement, striping, fences, signage and utilities. A comprehensive existing conditions base plan was prepared for the consultant’s use in design.