Client: RIDOT
Construction Cost: $347,687
Key Facts:
GM2 provided comprehensive engineering design services for the replacement a circa 1933 single-barrel reinforced concrete culvert with a 38FT long precast concrete box culvert with concrete wingwalls. The replacement structure was selected for its reduced environmental impacts, minimal disruption to traffic and construction schedule efficiency.