Client: Goodwin College
Construction Cost: $43 Million
Key Facts:
GM2 provided structural design services for the new, four-story 82,000 square foot, steel-framed magnet high school. The design incorporated lateral load resisting system provided by concrete steel tube braced frames. The external surface is clad in Rain Screen and Curtain Wall Systems. The project includes 6,000 square foot cafeteria/auditorium, fitness center, robotic lab, production studio, digital music lab, and media center.