Client: RIDOT
Construction Cost: $298,685
Key Facts:
GM2 provided comprehensive engineering design services for the replacement of this circa 1920 concrete slab structure supported on stone masonry abutments with a reinforced concrete culvert pipe (RCC). The replacement structure was selected for its reduced environmental impacts, minimal disruption to traffic and construction schedule efficiency.