Reconstruction of NH Route 125

Client: NHDOT

Construction Cost: $18.3 Million

Key Facts:

  • NEPA Documentation
  • Public Outreach Program
  • Alternatives Analysis
  • Water Quality Enhancements

GM2 was selected through a two-step QBS process to complete the engineering, update and re-evaluate the NEPA documentation, and provide a robust public outreach program for the proposed reconstruction of 1.7 miles of NH Route 125 in Plaistow and Kingston, NH.  Alternative development and analysis, traffic modeling and design, drainage design and water quality enhancement meeting the MS4 requirements, Right-of-Way land survey and documenting the State’s property rights along the corridor are all part of this design effort.