RIDOT On-Call Bridge Contract 2016-EB-035

Client: RIDOT

Construction Cost: $7.9 Million

Key Facts:

  • Design for 33 Bridges
  • Accelerated Construction Techniques
  • Emergency Declarations
  • NBIS Bridge Safety Inspection
  • Complex Traffic Management Plans

GM2 provided comprehensive engineering design services under a multi-year RIDOT contract for bridge engineering.

For each of the tasks awarded under this contract GM2 has successfully met project milestones and/or deadlines and has stayed within the defined budget. Assignments under this contract include the preservation of East Bay Bridges in East Providence, Barrington and Warren (22 bridges); and the preservation of I-295 Bridges in Cranston and Johnston (9 bridges). (Pictured Bridge No. 123, Barrington, RI)