Client: Town of Colebrook
Construction Cost: $1.7 Million
Key Facts:
GM2's design for the replacement structure entails a 115FT span girder bridge with semi-integral concrete abutments supported on drilled concrete shafts founded on rock. The scope of work included 385FT of realigned and reconstructed roadway approaches.