Sandy Brook Road over Sandy Brook

Colebrook, CT
Client:

Town of Colebrook

Construction Cost:

$1.7 Million

Key Facts:
  • Federal Local Bridge Program Project
  • Significant Skews; Extremely Sharp Curvature
  • Low Profile
  • Design and Construction Engineering & Inspection Services

GM2's design for the replacement structure entails a 115FT span girder bridge with semi-integral concrete abutments supported on drilled concrete shafts founded on rock. The scope of work included 385FT of realigned and reconstructed roadway approaches.