US Route 302 over Sawyer Creek

Hart's Location, NH
Client:

NHDOT

Construction Cost:

$2.4 Million

Key Facts:
  • Complete Design with Approval within 3-Months
  • Located within White National Forest
  • Design-Build Procurement
  • .5-mile of Roadway Reconstruction
  • Pavement Design


GM2 developed an approach and schedule to meet the quick demands associated with the design-build procurement. The 135-foot span replacement structure utilized AASHTO LRFD design specifications, including heavy riprap to protect the bridge from future flood damage. GM2’s services included roadway design, hydraulics and scour mitigation.