Client: Town of Wakefield
Construction Cost: Currently in Design
Key Facts:
Wakefield High School is currently in the process of evaluating a variety of conceptual designs for the development of the new campus. GM2 has completed the existing conditions survey for approximately 30 Acres and produce base mapping to provide a canvas for the conceptual designs. GM2’s traffic and transportation engineers have developed an existing condition report and evaluated the roadway network and traffic patterns on all roadways and entrances to the school. GM2 will continue to develop a complete TIAS with recommendations for improvements. As part of the transportation scope GM2 will provide conceptual designs for the intersection of Nahant Street Farm Street and Hemlock Road.